  • When should control joints be planned and installed in concrete slabs?
  • To move left with a walk-behind troweling machine, which action is correct?
  • How do you perform proper joint sealant installation in expansion joints?
  • When planning a floor installation, why is it important to standardize finishing methods across the entire area?
  • How do you prevent cold joints in a single placement?
  • If you observe a floor with two tones after finishing, this indicates?
  • How do you perform an air content test in the field, and what is a typical acceptable range?
  • Where should the gap be measured when using a straightedge to check flatness?
  • What is the primary purpose of a control joint in a concrete slab?
  • when specifications don't require a concrete slab to be in direct contact with the vapor retarder, the preferred method for reducing potential problems caused by slab curing is:
  • Portland cement will set and harden under water. Which of the following best describes this property?
  • Backer rod use in joint sealing?
  • Define bleed water and its impact on finishing.
  • Slabs at isolation joints must be free to move horizontally but not vertically. True or false.
  • What curing practice helps prevent surface dusting?
  • A ______ diameter pan is the largest size commonly used on walk-behind machines.
  • Portland cement will set and harden under water: True or False?
  • Hand-held vibrating screeds are often useful when striking off concrete with ______.
  • Increasing the amount of sand in concrete usually decreases the amount of water needed to make the concrete workable.
  • What is a common consequence of finishing a concrete slab too soon after placement?
  • Before troweling, what must have been done first to the surface?
  • When concrete is placed by crane and bucket, buckets must never be lifted over which paths?
  • How should you measure and control concrete temperature on site and why matters to finishing?
  • If a foreman notices color mismatch across a floor, what underlying cause is most likely?
  • Tilt of the trowel blade is excessive if the edge is more than ______ above the concrete surface.
  • The contraction joint spacing rule is described as spacing in feet should be 2-3 times slab thickness in inches. Which option correctly states this rule?
  • Which cement type is typically used for a ground-supported slab when sulfate exposure is not a concern?
  • Edging and jointing should be performed when?
  • A gallon of curing compound generally covers between what range of slab surface?
  • In mixed finishing, what would be the primary aesthetic concern for clients?
  • When is it appropriate to remove forms from a concrete slab that was placed against them?
  • Typical reason for surface dusting after curing and how to prevent?
  • Tools commonly used for hand spreading concrete in slabs include which of the following?
  • Truck-mounted conveyors are especially useful on jobs with which condition?
  • Which finish inconsistency is most likely to be noticed by occupants after the floor has cured?
  • The presence of two tonal areas on a floor suggests what about the finishing process?
  • Which action is an effective method to maintain moisture on the concrete surface during curing on hot or windy days?
  • Early entry dry cut saws cut the waiting period before sawing to as little as ________ in hot weather and about _________ in cold weather.
  • Edging and jointing is not required on most floors and should not be done unless specified.
  • What is the function of a darby or magnesium float in finishing?
  • Measuring the gap under a 10 ft straightedge is a method to determine which property?
  • Missing the window of finish ability can lead to surface defects and failure to achieve what?
  • F-number testing should preferably be done within how many hours after concrete placement, and never later than how many hours?
  • Around openings, what finishing steps should be performed to ensure edge quality?
  • The direction of the first machine floating pass should be ____________ to the direction of the last finishing procedure.
  • What happens if finishing steps are performed before the previous set?
  • Which item might be required as additional PPE beyond standard on some sites?
  • What is hot weather concreting and what finishing considerations apply?
  • A drying period after curing increases resistance to freezing and thawing damage. Which statement best describes this effect?
  • What concrete do you use magnesium bull floats on?
  • Joints that separate slabs from walls and columns are called ___________ joints.
  • Isolation joints separate slabs from walls and columns; what is the term used for these joints?
  • What is laitance and how can it affect finishing?
  • Magnesium bull floats are suitable for finishing concrete that is:
  • What happens when concrete temperature is outside the recommended range?
  • What causes trowel drag and how can you fix it on a finished slab?
  • At which meeting should the question about which finisher(s) can request water additions to the concrete be answered?
  • What term best describes the visual variation observed between machine-floated and hand-floated sections of a concrete floor?
  • Most concrete used in slabs on ground has coarse aggregate with a maximum size of:
  • Name two common finishing hazards on a job site and how to mitigate them.
  • Slabs at isolation joints must be free to move horizontally but not vertically. True or false.
  • How do you check that control joints are cut to the correct depth?
  • Why is timing critical between finishing steps?
  • What tool is used to establish the final grade and slope on a slab?
  • Drawings for joints in SOG typically require reinforcement to be discontinued at the joint. What is the typical intent described?
  • Concrete kept at a temperature of how many degrees for one day will usually reach the 500 psi compressive strength needed to prevent damage from freezing?
  • Which is a likely reason for color variation on a floor finished with both machine and hand tools?
  • Edgers primarily create edges on exterior concrete that are described as:
  • During cold weather, placing warm concrete on a cold subgrade is not ideal. It is best to have the warm concrete temp no more than _____ higher than the temp of the base.
  • Which practice helps when finishing concrete around reinforcing bars?
  • Which material bull floats are less likely to seal the surface?
  • What is cold weather concreting and what finishing considerations apply?
  • Which outcome would be flagged as a problem by a quality control checklist when different finishing methods are used side by side?
  • A fine broom finish is occasionally required for interior flatwork.
  • Which statement describes the function of vibrators during placement?
  • What is the purpose of backer rod in expansion joint installation?
  • What is a disadvantage of using trailer pumps for SOG placements?
  • What is the primary function of welded wire reinforcement in slabs-on-grade that are considered unreinforced?
  • How are curing compounds typically applied?
  • Chatter or washboard marks on a finished surface are caused by tilting the trowel blade too much or too soon.
  • Highway straight edges are used to cut and fill concrete surfaces at which orientation to the construction joint?
  • How should you prepare a concrete surface for curing on a hot day?
  • Floating and toweling a concrete slab too soon can cause which problems?
  • What should be done after form removal when a release agent was used?
  • In hot weather, when slab curing may start after placing but before finishing, which two methods can be used?
  • What should you check before finishing a slab to ensure good surface quality?
  • To move left with a walk-behind troweling machine, which action is recommended?
  • What does a screed establish on a slab?
  • An admixture that reduces bleeding while retarding setting will aggravate crusting problems. True or False?
  • Which statement best describes the purpose of edge finishing?
  • What is the role of a release agent in decorative concrete?
  • Bulls floats are used when achieving which specific F-number floor flatness?
  • Recommended sequence for beveling and edging around openings?
  • Edgers are used to make neat, _____ edges primarily on ______ concrete.
  • Power trowels can be used for floating or troweling.
  • What is the difference between a control joint and an expansion joint?
  • On stiffer concrete, a forward-turn, forward-pass combination on a rider allows the finish to always ________ the concrete being floated or troweled.
  • Which cement type is most appropriate when sulfate exposure is not present in a slab on ground?
  • If trowel drag occurs due to moisture, what is the recommended correction?
  • What is the most common finishing sequence for a typical slab on grade?
  • In hot weather finishing, which measures help prevent flash set?
  • What purpose do warmers and blankets serve in cold weather concreting?
  • Which practice helps prevent chipping during finishing around openings?
  • Retarding admixtures used in hot-weather concrete reduce the possibility of surface crusting. True or False?
  • What is edge finishing and why is it important?
  • PPE is mandatory for finishers on most sites. Which set is correct?
  • Why should curing compounds not be used on exterior concrete placed during fall or cold weather?
  • How do you perform a field slump test?
  • What is scaling in concrete finishing and how can it be prevented?
  • How do you identify when to perform the first trowel pass?
  • Keyed construction joints are not recommended for slabs less than how thick?
  • What considerations apply when finishing vertical surfaces like walls?
  • Why should bleed water be checked before finishing a slab?
  • What is popout and how can you prevent it?
  • What distinguishes wet curing from membrane curing?
  • Wood hand floats are best for which concrete condition?
  • Why is adequate concrete cover important around reinforcing steel during finishing?
  • Which instruction is commonly required on drawings for SOG regarding reinforcing steel at joints?
  • Curing compounds should not be used on exterior concrete placed during fall or cold weather because they may not wear off in time for concrete to dry. True or False?
  • What is slump and why is it important to the finisher?
  • What is the difference between a floating finish and a trowel finish?
  • What is the main result of the final steel trowel finish on a concrete slab?
  • When should curing compounds be applied?
  • The difference between two sections finished with different methods is most likely to affect which aesthetic aspect?
  • To maintain a uniform appearance on a floor, what should be avoided when performing finishing operations?
  • When should a broom finish be applied on a concrete slab?
  • Which two floor properties does the F-number system evaluate?
  • Concrete is ready for floating when the bleed water sheen is gone and a finisher can walk on the slab leaving only about a ______ footprint.
  • For floor flatness evaluation, which straightedge length is specified for measuring the gap?
  • Who is responsible for reading and understanding project specifications?
  • In decorative concrete, what is the purpose of a release agent and how should it be used?
  • Laitance definition and effect.
  • Which practice best confirms there are no voids near formwork after finishing?
  • Which statement is true regarding the use of a 3 inch thick layer of manufactured sand on the vapor retarder?
  • Aside from slip resistance, what is another benefit of a broom finish on exterior slabs?
  • Bull floating must be done after all the bleed water has evaporated from the surface. True or False?
  • What is meant by 'finish order' in concrete finishing?
  • When some areas of a floor are machine floated and troweled but other areas must be hand floated, what is likely in the finished surface?
  • Which statement about a fine broom finish is accurate?
  • If blisters do form, what should you do to the trowel blades and what kind of float should you reopen the surface with?
  • What is the expected conclusion if both machine and hand finishing are used on the same floor?
  • Finishers must hit the gap in the window of finish ability to avoid which pair of problems?
  • If a concrete slab on ground is not exposed to sulfates, the cement used is most likely to be:
  • What is the most direct indicator of mixed finishing methods affecting surface appearance?
  • What is the effect of sealing or densifying treatment after curing?
  • When concrete for a slab placement is discharged from the truck chute, how should truck arrivals be spaced?
  • In excavation safety, what is the recommended minimum distance between a truck wheel and the excavation edge?
  • When hand floating finishers should always start with the ___________ and then move to the ____________ size of float.
  • When using a magnesium bull float, sealing the concrete surface is less likely if you:
  • If contraction joints are cut too soon the joint may ______ but if too late random __________ can occur.
  • What is the primary purpose of using a bull float after initial screeding?
  • The F-number system is a method for determining which floor characteristics?
  • When guiding a truck near a 6 ft deep excavation, the wheels closest to the edge should be at least how many feet away?
  • Granular subbases for slabs on ground can be compacted with sheepsfoot rollers. True or False?
  • Which option correctly matches a common surface defect with its remedy?
  • Which method most reliably verifies adequate consolidation near formwork without saw cutting?
  • The action that reduces sealing when using a magnesium bull float is to
  • Which tool is commonly used for hand spreading concrete in slabs?
  • If concrete is kept at a temperature of 50 degrees for one day, what compressive strength is typically reached to prevent damage from freezing?
  • Why is broom finish often recommended for exterior slabs?
  • Using a squeegee to remove water should be done when only water, not _____, is removed.
  • On a slab treated with both machine and hand finishes, what would a spec sheet most likely call out as an issue needing resolution?
  • ____________ bull floats are less likely to seal the surface.
  • Which spacing is the rule of thumb for a long, wide slab if thickness is known?
  • What is a key goal of proper consolidation near rebar?
  • Troweling follows immediately after which step?
  • What is the purpose of curing compounds and how are they applied?
  • Which statement accurately describes the purpose of welded wire reinforcement in unreinforced SOG?
  • On stiffer concrete, the effect of a forward-turn, forward-pass on a rider is to ensure the finish faces the concrete.
  • Which finish is described as possibly including a broom texture if desired?
  • Which condition indicates that floating is appropriate to begin finishing?
  • Control joint spacing rule of thumb for a long, wide slab?
  • What is an air-entraining admixture used for and how does it affect finishing?
  • Overworking the surface during finishing can cause which combination of effects on the final appearance?